Blackhillock 300MW BESS

Zenobē’s Blackhillock battery near Keith stores electricity and provides grid-stability services to help absorb Scottish renewable generation.[1]

Current position

Final commissioning of the full 300MW / 700MWh build is scheduled for Q1–Q2 2027. The initial 200MW phase entered operation in early 2025.

Benefits

  • Full planned capacity of 300 MW / 700 MWh; the initial operational phase is 200 MW.
[2]