GSK Cambridge Biomedical Campus R&D Centre

GSK is establishing a 300,000-square-foot research centre on Cambridge Biomedical Campus, bringing more than 1,000 scientists into three interconnected laboratory buildings. The facility is intended to concentrate UK research in oncology, respiratory disease, hepatology, vaccines and HIV alongside hospitals and university researchers.[1][2][3][4][5][6][7]

Project details

Prologis is developing 2000, 3000 and 4000 Discovery Drive. The first 112,000-square-foot building reached shell-and-core completion on 28 September 2026, but specialist laboratories and GSK occupation are not yet proven complete. The remaining buildings are expected to follow, with phased staff transfers by 2029.

GSK has announced £400 million of UK investment over three years associated with the Cambridge move and improvements at Ware. The figure cannot all be assigned to this Cambridge building project; its dedicated capital cost remains undisclosed. Much of the >1,000 scientific workforce is being relocated from GSK's Stevenage R&D site, rather than necessarily recruited into newly created jobs.

Map information

The pin represents the mapped 2000 Discovery Drive building, the first part of a multi-building project; it does not locate the other buildings.

Timeline

28 July 2026
GSK names new centre.

28 September 2026
2000 Discovery Drive shell/core completed.

2027
Expected construction starts for 3000 and 4000.

By 2029
Planned phased GSK scientist relocation.

Sources
  1. gsk.com ↗
  2. cambridge-biomedical.com ↗
  3. sdc.co.uk ↗
  4. greatercambridgeplanning-pre-production.azurewebsites.net ↗
  5. planningalerts.org.uk ↗
  6. streetlist.co.uk ↗
  7. mapcarta.com ↗