Project facts
Location: Rutherford Appleton Laboratory, Harwell Campus, Oxfordshire[4][5]
Client: Science and Technology Facilities Council (STFC)
Status: Approved — planning permission reported October 2026
Planned floor area: Approximately 13,000 m²
Design: Stride Treglown
Construction: Expected to begin in 2027
Current programme
Known as R131, the facility is designed to modernise STFC's science and engineering accommodation. It will bring researchers and technical staff together from older buildings into flexible laboratories, workshops and shared support spaces intended to accommodate changing research requirements.
The permission was reported by specialist property publications on 26 October 2026. The exact council decision notice and date have not yet been established in the sources reviewed. Construction is expected to begin in 2027 and has not been confirmed to have started.
Scientific and technical space
The approximately 13,000-square-metre building will contain wet and dry laboratories, specialist cleanrooms, engineering workshops and supporting office space. The design aims to support research groups whose experiments require flexible room configurations, new specialist equipment and technical servicing over time.
The building's shell-and-core strategy is intended to allow equipment and laboratory layouts to change without extensive rebuilding, supporting the long-term utilisation of public research infrastructure.
Staff and institutional role
R131 is expected to consolidate around 410 existing researchers and support staff currently distributed across the STFC estate at Harwell. This is a relocation and modernisation programme; it should not be recorded as the creation of 410 additional jobs.
STFC's Rutherford Appleton Laboratory hosts national research facilities, engineering programmes and specialised scientific support work. The new R131 building will form part of this wider physical estate rather than replace every national science asset or introduce a new national research agency.
Building and sustainability design
The proposed design includes an internal shared circulation area intended to connect laboratories, meeting places, a café and informal collaboration spaces. Large external windows and lightwells would provide natural light to research and occupied areas.
The architects describe a low-energy, net-zero operational-carbon design ambition, along with sustainable heating, enhanced insulation, efficient water use and an aim to deliver a 10% biodiversity net gain through the landscape plan. These represent planned design features and future performance targets, not measurable benefits already achieved.
The landscaped surroundings would include planted areas, outdoor seating and retention of established trees where compatible with the consented site.
Planning and construction
Specialist industry publications reported planning permission for R131 on 26 October 2026. The precise statutory decision date and application reference have not been independently established.
Earlier public procurement records include R131 pre-construction and design-related activities. Such professional services do not demonstrate that the main five-storey building was under construction in October 2026.
Physical construction is expected during 2027. The opening date, total cost and building contractor for main works remain unverified.
Relationship to other Harwell buildings
R131 is an STFC research-estate project at the Rutherford Appleton Laboratory.
It is separate from the newly announced 155,000-square-foot Vertex Pharmaceuticals research facility proposed elsewhere on Harwell Campus, which as of 28 October 2026 still required planning approval. It is also separate from Moderna's operating Innovation and Technology Centre and the CO:LABS research property on the campus.
These are separate sites with distinct delivery programmes and investment figures.
Why it matters
The new building would replace ageing science accommodation with more adaptable and technically equipped research laboratories. Better specialist space, engineering workshops and shared services may improve the ability of STFC staff to undertake complex research and maintain national scientific capabilities.
Map information
Approximate R131 location near the existing R113 building. The marker is a representative point and does not show the exact new building footprint. [2][3]
Timeline
2024–2025
STFC develops design and preconstruction preparation for R131.
2025–2026
Public procurement for pre-construction services and enabling-design planning.
By 26 October 2026
Specialist press confirms R131 planning permission had been granted; exact signed council date to verify.
2027 (expected)
Main building construction anticipated to begin.
Future
Laboratory fit-out, staff relocation, commissioning and opening; dates not yet confirmed.
Latest developments
A new five-storey research building has received planning permission at the Science and Technology Facilities Council's Rutherford Appleton Laboratory on Harwell Science and Innovation Campus in Oxfordshire.
The R131 facility will provide approximately 13,000 square metres of modern research and support space, including engineering workshops, specialist cleanrooms and laboratories for both wet and dry scientific research.
Designed by Stride Treglown, the building will consolidate around 410 existing researchers and staff currently spread across older accommodation at the campus. Its flexible laboratories and supporting infrastructure are intended to accommodate changing scientific equipment and research programmes over time.
Plans also incorporate lower-energy building services, shared collaboration spaces and landscaping. Construction is expected to begin in 2027, although work on the main building has not yet been confirmed as under way.
The scheme is separate from Vertex Pharmaceuticals' recently announced proposal for a new research facility elsewhere at Harwell, which remains subject to planning permission.
Sources
- benews.co.uk ↗
- rfi.ac.uk ↗
- govmarket.uk ↗
- ukpropertyforums.com ↗
- biouk.com ↗
- d3tenders.com ↗
- ukri.org ↗
- planindex.co.uk ↗
- valeofwhitehorse.planning-register.co.uk ↗
- planindex.co.uk ↗
- d3tenders.com ↗