Ørsted completes construction of 300MW Iceni battery site
Ørsted reports that construction of its 300MW, 600MWh Iceni battery storage site near Norwich is complete, with 170 Tesla Megapacks installed beside the Hornsea 3 onshore converter station. Commissioning and testing have begun. Electrical installation continues, including the cables linking the two battery areas across the converter-station site, and preparations are under way to energise the battery transformer. The system has yet to enter full operation.