Material Evolution — Mevo A1 Cement Facility
Mevo A1 is Material Evolution’s cement production facility at the CCP Building Products site in Llay, Wrexham. Its first batch was produced in October 2024, and the company announced industrial operation in December 2024.[1]
Current position
Material Evolution’s 4 December 2024 announcement reported commissioning, industrial production and the official opening.
Project details
- The plant is designed to produce 120,000 tonnes of cement annually. Actual annual production has not been reported in the reviewed evidence.
- It uses an alkali-fusion process without a conventional cement kiln and is located alongside a concrete-block manufacturer.
- Mevo A1 is co-located with CCP Building Products on Llay Road. The pin uses the site reference supplied in Material Evolution’s environmental application.
Timeline
October 2024
First cement batch produced.
4 December 2024
Industrial operation and formal opening announced.