Current position
Construction of a 130,000-square-foot warehouse at Alexandra Dock was reported under way in October 2026, with completion expected in 2027. Other Liverpool and Glasgow components remain planned.
Project facts
Locations: Port of Liverpool, Merseyside; King George V Dock, Glasgow
Operator: Peel Ports Group
Status: Live — delivery under way in Liverpool
Planned capacity: Around one million square feet of additional port-related warehousing
Programme value: Not publicly specified
Port of Liverpool
Peel Ports describes a planned new 900,000-square-foot warehouse and upgrades to existing facilities at Liverpool. Place North West reports a 900,000-square-foot capacity expansion through a mix of new buildings and repurposed space; the two descriptions have not been reconciled.[2][3]
A 130,000-square-foot warehouse at Alexandra Dock was under construction by October 2026, with completion anticipated in 2027. Place North West also reported planning permission for a separate proposed 180,400-square-foot warehouse. The relationship between these units and the wider 900,000-square-foot figure remains to be confirmed.
King George V Dock, Glasgow
On the River Clyde, Peel Ports plans a further 100,000-square-foot warehouse at King George V Dock through Clydeport, intended to improve storage and distribution services for industrial importers in Scotland. This is proposed new physical warehousing, separate from Liverpool's target.
The operator has also highlighted specialised bonded storage offered at Greenock, but there is no verified statement that these existing services represent another new warehouse within the announced 2026 one-million-square-foot target.
Investment and delivery
Peel Ports has described this as a multi-million-pound programme but has not disclosed a verified consolidated construction cost or final delivery timetable. The October 2026 announcement is a corporate capacity-development plan backed by actual construction at Alexandra Dock and additional planning approvals.
The programme remains in delivery; the full million square feet has not been completed.
Why it matters
Port-proximate warehouses are part of the national freight infrastructure enabling imports, industrial supply and distribution. Adding significant storage capacity alongside existing harbour and transport facilities can reduce unnecessary onward journeys and improve the flexibility of supply chains.
Timeline
June 2026
Sefton Council reportedly grants planning consent for an approximately 180,400-square-foot Alexandra Dock warehouse (planning ref DC/2026/00668).
7 October 2026
Peel Ports publicly announces phased plan to add around one million square feet of warehousing across its network.
9 October 2026
Industry press independently reports that construction is well under way on a 130,000-square-foot Alexandra Dock warehouse, expected to complete in 2027.
2027 (forecast)
Completion of the active 130,000-square-foot Liverpool building; not an achieved opening.
Future
Further Liverpool conversion/new-build components and Glasgow 100,000-square-foot warehouse, subject to verified consents and work.
Latest developments
Peel Ports has announced plans for around one million square feet of additional port-side warehousing across Liverpool and Glasgow. The operator describes a new 900,000 sq ft warehouse and upgrades in Liverpool, while industry reporting describes 900,000 sq ft of added Liverpool capacity through new and repurposed buildings. The two descriptions have not been reconciled. On 9 October, Place North West reported that a 130,000 sq ft warehouse at Alexandra Dock was under construction, with completion expected in 2027; a further 100,000 sq ft facility is planned at King George V Dock in Glasgow.