UK Progress Atlas

Renewables & Energy · Electricity transmission

Sea Link — Suffolk–Kent Electricity Transmission Connection

Sea Link is a proposed 2 GW electricity transmission reinforcement between Suffolk and Kent. It will connect two areas of Britain's domestic electricity grid using a long high-voltage direct-current (HVDC) link, most of which will be installed beneath the sea.[1]

Project facts

Location: Suffolk and Kent, England, primarily offshore

Developer: National Grid Electricity Transmission

Status: Approved — development consent granted 30 October 2026

Transmission capacity: 2 gigawatts (GW)

Length: Approximately 138 kilometres, including 122 kilometres offshore

Construction: Expected to begin in early 2027

Expected completion: 2031

Current programme

The scheme received its Development Consent Order on 30 October 2026 after examination by the Planning Inspectorate. This is a statutory permission for a major nationally significant infrastructure project. National Grid must still complete post-consent requirements and detailed delivery preparations before the main works proceed.

Once commissioned, the new route is intended to relieve constraints on existing transmission corridors and help move electricity generated in East Anglia and elsewhere in the network towards demand in south-east England. It will not generate electricity itself.

Why a new transmission link is needed

Large amounts of new renewable generation, including offshore wind, are planned to connect to the electricity system in East Anglia. When the existing grid cannot transfer all the electricity being produced, the system operator may pay generating stations to reduce their output and obtain replacement power elsewhere.

A new 2 GW route gives the system an alternative pathway, potentially reducing network congestion and making it easier to use domestic electricity generation. National Grid describes Sea Link as able to transfer electricity between Suffolk and Kent in either direction when system conditions require.

The government compares its 2 GW capacity to the electricity demand of roughly two million homes. This is a capacity analogy, not a forecast of extra homes connected or a claim that Sea Link will generate energy.

Route and offshore infrastructure

Sea Link will extend approximately 138 km between new transmission infrastructure near Saxmundham in Suffolk and Minster in Kent. National Grid's current route breakdown identifies around 122 km of subsea HVDC cable running between a Suffolk landfall north of Aldeburgh and a Kent landfall at Pegwell Bay.[2]

The remainder involves underground onshore cables, converter stations, connection infrastructure and associated transmission works. The precise offshore and onshore alignment is defined in the consent and supporting plans.

The route is entirely within Britain. Sea Link is an internal grid reinforcement, not an international electricity interconnector.

Suffolk infrastructure

The approved proposals include a new offshore cable landfall north of Aldeburgh, a transition joint bay about one kilometre inland, and approximately 10 km of underground HVDC cable running towards a new converter station near Saxmundham.

A further approximately 1.9 km of high-voltage alternating-current (HVAC) cable would connect that converter station to the Kiln Lane substation near Friston.

The construction of Kiln Lane substation and its connections to existing overhead lines is being delivered as a separate infrastructure project under consents associated with East Anglia ONE North and East Anglia TWO. It should not be counted as a newly consented Sea Link substation or duplicated as part of this project's construction records.

Kent infrastructure

At the southern end, Sea Link's marine cable will reach land at Pegwell Bay, on the Kent coast. A transition joint bay approximately 800 metres inland will connect the subsea cables to about 1.7 km of underground HVDC cable leading to a new converter station near Minster.

A new substation is also planned beside the Minster converter station. The project includes removing about 2.2 km of existing overhead lines and constructing about 3.5 km of replacement overhead lines to connect the new facilities with the national transmission network.

The development will therefore create physical infrastructure inland as well as along the seabed, including areas where construction will affect access, landscape and neighbouring communities.

Converter technology

Sea Link uses high-voltage direct current for its long-distance transmission section. Converter stations at either end will interface with Britain's alternating-current network.

The converter stations are intended to be delivered by Siemens Energy. HVDC allows large amounts of electricity to be transmitted over long submarine distances, while the terminal stations perform the conversion required to integrate with the existing grid.

This is a planned system capability: no new 2 GW transfer capacity has yet been brought into operation.

British industrial supply chain

National Grid says the subsea cable for Sea Link will be manufactured by Sumitomo Electric at the £350m Port of Nigg factory in Scotland, which was formally opened in October 2026.

The factory is a separate industrial project. Its opening and Sea Link's October consent are separate developments. The supply relationship establishes a potential use of the British manufacturing facility, but it does not mean that all Sea Link cable has already been manufactured, laid or energised.

Siemens Energy's UK operations, including work in Manchester, are involved in converter-station engineering and control systems.

Regulatory approval and construction timetable

National Grid applied for development consent in March 2025. The Planning Inspectorate accepted the application in April 2025 and held an examination from November 2025 to May 2026. The Examining Authority submitted its recommendation to government on 30 July 2026.

The Secretary of State granted the Sea Link Development Consent Order on 30 October 2026, allowing the project to progress into post-consent delivery planning.

National Grid's October announcement anticipated the main construction programme beginning in early 2027, subject to discharging detailed requirements, construction plans and environmental obligations, and completing by 2031. These are intended dates, not construction or operational milestones already achieved.

Some preparatory surveys, archaeological excavation and ground investigations in Kent took place under separate permissions granted during August 2026. Such activities do not establish that construction of the fully consented transmission link was under way before the DCO.

Project cost and regulatory scrutiny

The October government approval was a planning decision, not an announcement of a new £3bn government grant or a final agreed project construction budget.[3][4]

Ofgem's September 2026 project-assessment consultation considered National Grid Electricity Transmission's requested allowance of approximately £3,197 million and a provisional regulatory allowance of approximately £2,892 million, expressed in 2023/24 prices. The regulator's assessment was still awaiting a final decision in late October. These are regulatory funding figures rather than the verified final outturn cost of the completed link.

Cost increases have attracted scrutiny, as have the extent of the project's network benefits and how future expenditure will be recovered through the regulated electricity transmission system. Further Ofgem decisions and actual contracted construction costs should be tracked separately from the DCO milestone.

Local and environmental effects

The new landfalls, converter stations, substations, overhead-line works and construction access arrangements will have local effects in Suffolk and Kent. Suffolk County Council and community organisations have raised concerns about construction traffic, landscape changes, environmental impacts and the cumulative burden of energy projects in the area. Kent Wildlife Trust and local campaigners have also expressed concerns about sensitive habitats around Pegwell Bay and Minster.[5]

The development-consent decision follows consideration of these representations during the statutory examination. National Grid must implement the consented environmental, construction and traffic-management requirements as the scheme progresses.

National Grid has separately proposed community funds of just over £1 million each for Suffolk and Kent. These funds are associated community benefits, not expenditure on the cable itself or newly completed infrastructure.

Relationship to other electricity projects

Sea Link is a 2 GW domestic grid route within National Grid's wider Great Grid Upgrade programme, alongside other transmission reinforcements across England and Wales.

The adjacent Kiln Lane substation in Suffolk and the Sumitomo cable factory in Scotland are connected to Sea Link's future operation or supply chain but have separate consents, project boundaries and delivery records.

Why it matters

The Sea Link permission advances a major new route for moving up to 2 GW of electricity between two regions of the existing British transmission network. Additional transfer capacity could reduce the need to curtail available generation, improve operating flexibility and support rising demand without constructing generation capacity at the project itself.

Map information

Sea Link is currently shown without a map route while its consented cable alignment is verified.

Timeline

27 March 2025
National Grid submits the Sea Link development-consent application.

23 April 2025
Application accepted for examination.

November 2025–May 2026
Statutory examination of the proposal, including public and local authority evidence.

30 July 2026
Examining Authority recommendation submitted to the Secretary of State.

August 2026
Separate permissions allow some preparatory archaeological and ground-investigation activity in Kent.

1 September 2026
Ofgem opens its project-assessment consultation on regulatory costs and outputs.

30 October 2026
Government grants development consent for Sea Link.

Early 2027 (expected)
Main construction programme anticipated to begin, subject to post-consent planning and requirements.

2031 (target)
Subsea cable, converter stations, connections and grid reinforcement expected to be completed and brought towards service, subject to commissioning.

Latest developments

Renewables & Energy · 30 October 2026

Government approves 2GW Sea Link subsea electricity cable between Suffolk and Kent

The government has granted development consent for Sea Link, a proposed 2-gigawatt electricity transmission connection between Suffolk and Kent, following an examination by the Planning Inspectorate.

Developed by National Grid, the 138-kilometre link will run primarily offshore, including approximately 122 kilometres of subsea cable, with landfalls north of Aldeburgh in Suffolk and at Pegwell Bay in Kent.

The scheme will include high-voltage direct-current converter stations near Saxmundham and Minster, alongside underground cables and connections to the existing transmission network. It is designed to move electricity between eastern and south-eastern England, easing constraints that can otherwise require renewable generators to reduce output.

National Grid has appointed Siemens Energy to deliver the converter stations and says that Sumitomo Electric will manufacture the offshore cable at its recently opened factory at the Port of Nigg in Scotland.

The Development Consent Order was granted on 30 October. National Grid expects construction to begin in early 2027 and the link to be completed by 2031, subject to detailed delivery arrangements and remaining requirements.

Sea Link is not yet built or carrying electricity. Its estimated cost is subject to a separate Ofgem regulatory assessment, and the planning decision does not itself establish that construction expenditure has been finalised.

Sources
  1. nationalgrid.com ↗
  2. nationalgrid.com ↗
  3. ofgem.gov.uk ↗
  4. committees.parliament.uk ↗
  5. suffolk.gov.uk ↗
  6. gov.uk ↗
  7. gov.uk ↗
  8. nationalgrid.com ↗
  9. nationalgrid.com ↗