UK Progress Atlas

Renewables & Energy · Solar

Tillbridge 800 MW Solar Farm + 500 MW BESS

Tillbridge is a solar and battery development east of Gainsborough, with a grid connection at Cottam.[1]

Current position

The project received development consent on 14 October 2025.

Benefits

  • 500 MW import/export connection capacity. This differs from solar-panel capacity, so the figures should not be added together.
Sources
  1. tillbridgesolar.com ↗