Current position
The building’s structural steel frame was complete by 22 September 2026. EPCC expects the supercomputing service to become operational in early 2028.
Project facts
Location: EPCC Advanced Computing Facility, near Edinburgh
Host: EPCC, University of Edinburgh
Funder: UK Government through UK Research and Innovation
Investment: Up to £750 million across the national supercomputing service
Status: Live — building construction under way
Projected availability: Early 2028
New computing infrastructure
Robertson Construction Central East began work on the new building during 2026. The structure is designed to accommodate advanced computing equipment and the associated power, cooling and technical plant necessary for a large national high-performance-computing service.[4][5]
EPCC has long operated major research computing systems at its secure Advanced Computing Facility. The new service will expand and replace national capacity, not represent the very first computer or data centre at the site.
September 2026 construction milestone
By 22 September 2026, the structural steel frame of the new building had been completed. The milestone was marked during a visit by the UK AI minister, Kanishka Narayan, alongside university researchers and construction representatives.
The building’s envelope, plant, power connections and specialist computing equipment remain to be delivered and commissioned.
Expected uses
The future system will provide a national resource for complex scientific simulations, data-intensive research and industrial computing. Its applications are intended to include modelling extreme weather and flood risks, advanced aircraft engineering and research into diseases and treatments.
The hardware architecture and installed computing performance have yet to be confirmed.
Why it matters
A national supercomputer is durable scientific infrastructure: it can enable research that is impractical on smaller machines and support academics and businesses needing large-scale simulations or data processing. The Edinburgh project would increase the UK's sovereign high-performance-computing capacity and improve access for research across several disciplines.
Map information
The pin marks the existing Advanced Computing Facility building at Easter Bush. The new supercomputer will be housed in an extension to its Computer Room 4; the pin is not a surveyed outline of that extension. [2][3]
Timeline
June 2025
Government confirms up to £750 million for a new national supercomputer in Edinburgh.
June 2026
Robertson Construction confirms the physical start of the new facility's construction.
22 September 2026
EPCC and the University announce completion of the building's structural steel frame.
Early 2028 (latest official forecast)
EPCC expects the computing service to become available to researchers and industrial users.