UK Progress Atlas

Atlas News

Critical Infrastructure
A walker carrying a child with a dog on a countryside hillside
Photo creditUK Government / Crown copyright · Open Government Licence v3.0 · Original image · Cropped for display.
Latest development

Rural 4G expansion brings full-network coverage to 37,000 more square kilometres of Britain

The UK's programme to improve mobile reception in remote communities has reached 175 government-funded mast upgrades, as the Shared Rural Network continues to extend 4G coverage across the countryside.

Read story

The UK's programme to improve mobile reception in remote communities has reached 175 government-funded mast upgrades, as the Shared Rural Network continues to extend 4G coverage across the countryside.

Since the programme began in 2020, an additional 37,000 square kilometres of the UK — an area considerably larger than Wales — have gained 4G coverage from all four mobile networks, according to the programme's published figures. The wider rollout has also extended mobile coverage to approximately 280,000 additional premises and 16,000 kilometres of roads.

The latest milestone, announced on 24 November, brings the number of government-funded mast upgrades operating in England to 50, delivering improved coverage across approximately 640 square kilometres of countryside. Across England, Scotland and Wales, 175 upgraded masts are now operational.

Many of these upgrades make existing emergency-services masts available to commercial mobile networks, allowing customers of different operators to receive signals in locations previously served by only one. The improvements support rural businesses, farms, residents and visitors, enabling everything from mobile payments and navigation to remote monitoring of agricultural equipment and livestock.

The expansion forms part of a wider change in Britain's mobile connectivity. In January 2026, Ofcom estimated that 96% of UK land area had 4G coverage from at least one operator, compared with 91% when the programme was agreed in 2020. Coverage from all four operators had reached 84%, reducing the extent of areas where mobile reception depends on the customer's choice of network.

Further government-funded mast upgrades are scheduled under the programme, whose main delivery phase runs until January 2027.

Nationwide cyber operation protects tens of thousands of UK fridges and freezers

Cybersecurity specialists and UK authorities have helped protect tens of thousands of commercial fridges and freezers in an operation spanning supermarkets, warehouses, food producers and other businesses. Thousands of internet-connected refrigeration controllers were taken off the public internet or had their access restricted after researchers identified vulnerabilities that could have allowed attackers to interfere with temperature controls.

Read story

Cybersecurity specialists and UK authorities have helped protect tens of thousands of commercial fridges and freezers in an operation spanning supermarkets, warehouses, food producers and other businesses. Thousands of internet-connected refrigeration controllers were taken off the public internet or had their access restricted after researchers identified vulnerabilities that could have allowed attackers to interfere with temperature controls.

The weaknesses were identified by Omega Solutions and investigated further by Pen Test Partners. Working with the National Cyber Security Centre, Defra, the Food Standards Agency, the British Retail Consortium and industry operators, the teams traced exposed equipment and alerted businesses across the food supply chain. The British manufacturer Resource Data Management has released new firmware, while retailers and other operators have moved affected systems onto more secure networks.

The work followed cyberattacks that disrupted refrigeration at supermarkets in several European countries during October and November. The coordinated response has strengthened the security of a substantial part of Britain's commercial cold chain, reducing the risk of spoiled food and disruption to distribution. Researchers say exposure at major operators has largely been addressed, although some smaller suppliers may still need to act.

RAF Brize Norton reopens upgraded 3km runway after 16-week rebuild

Aircraft have returned to RAF Brize Norton in Oxfordshire after a complete rebuild of the base's three-kilometre runway, the central phase of a £180 million programme to renew its airfield infrastructure.

Read story

Aircraft have returned to RAF Brize Norton in Oxfordshire after a complete rebuild of the base's three-kilometre runway, the central phase of a £180 million programme to renew its airfield infrastructure.

The first aircraft landed on 13 November following 16 weeks of construction. The new runway combines Pavement Quality Concrete with Grooved Marshall Asphalt, materials selected to improve resilience to heat and extend its working life. The Defence Infrastructure Organisation expects the concrete construction to more than double the runway's service life compared with the previous surface.

Work on taxiways, airfield lighting, drainage and supporting infrastructure will continue, with the overall programme scheduled for completion in late 2027. The upgrades will support the RAF's principal air mobility base for decades to come.

National Cyber Force opens permanent Lancashire headquarters

The National Cyber Force has formally opened its new headquarters, Ribble House, at Samlesbury in Lancashire. The facility brings together specialists from GCHQ, the Ministry of Defence, MI6 and the Defence Science and Technology Laboratory to conduct cyber operations against hostile states, terrorists and serious criminals.

Read story

The National Cyber Force has formally opened its new headquarters, Ribble House, at Samlesbury in Lancashire. The facility brings together specialists from GCHQ, the Ministry of Defence, MI6 and the Defence Science and Technology Laboratory to conduct cyber operations against hostile states, terrorists and serious criminals.

King Charles III marked the opening on 16 November 2026, meeting personnel already working at the site. The headquarters establishes a permanent centre for the UK's offensive cyber capability in the North West, alongside regional efforts to develop cyber skills. Details of its operating capacity are not publicly disclosed.

Structure completed at new 1,700-place Leicestershire prison

The main structure of HMP Welland Oaks has been completed near Market Harborough, with the final building beam installed, the Ministry of Justice announced on 13 November. The new Category B prison is designed to hold around 1,700 people.

Read story

The main structure of HMP Welland Oaks has been completed near Market Harborough, with the final building beam installed, the Ministry of Justice announced on 13 November. The new Category B prison is designed to hold around 1,700 people.

Wates is building the prison alongside HMP Gartree. The complex includes seven houseblocks, workshops and education facilities, while security systems and other fit-out work are still to follow.

The prison is expected to receive its first prisoners in early 2029. Construction began in 2025 as part of the government’s programme to add 14,000 prison places by 2031.

Somerset completes first two pumping-station upgrades in £11m flood-resilience programme

New pumping equipment has been installed at Midelney and Huish Episcopi in the Somerset Levels, the Environment Agency confirmed on 12 November, as part of an £11 million programme modernising six pumping stations.

Read story

New pumping equipment has been installed at Midelney and Huish Episcopi in the Somerset Levels, the Environment Agency confirmed on 12 November, as part of an £11 million programme modernising six pumping stations.

The new pumps are designed to be more reliable and energy-efficient than the decades-old equipment they replace, while reducing impacts on fish and eels. Pumping stations help manage winter flooding and support summer irrigation across the low-lying Levels and Moors.

Northmoor and Westover are scheduled for upgrades in 2027, followed by Long Load and North Drain in 2028, extending the modernisation across the network.

Royal Navy agrees to acquire three new mine-hunting motherships

The Royal Navy has agreed to acquire three new Offshore Support Vessels under a joint procurement arrangement with Norway, giving Britain a new fleet of motherships for remotely operated mine-hunting systems. The Ministry of Defence confirmed the commitment on 12 November with an additional £90 million allocated for the acquisition in the Defence Investment Plan.

Read story

The Royal Navy has agreed to acquire three new Offshore Support Vessels under a joint procurement arrangement with Norway, giving Britain a new fleet of motherships for remotely operated mine-hunting systems. The Ministry of Defence confirmed the commitment on 12 November with an additional £90 million allocated for the acquisition in the Defence Investment Plan.

The ships will support unmanned equipment used to find and dispose of sea mines, allowing sailors to work further from danger. The UK will join Norway's P1118 standardised-vessel programme, with the first British ship scheduled for delivery in 2031 and an option to acquire three more.

The agreement establishes a defined procurement route for a new Royal Navy capability and extends the two countries' naval cooperation.

Work begins on £206m expansion of Stafford Army barracks

Construction has begun on a £206 million upgrade of Beacon Barracks in Stafford, preparing the base to accommodate additional Army units from 2029.

Read story

Construction has begun on a £206 million upgrade of Beacon Barracks in Stafford, preparing the base to accommodate additional Army units from 2029.

The project will provide two new accommodation blocks with 232 bedspaces, new workspaces for engineering, intelligence and command personnel, and a police station for the Royal Military Police. An armoury and storage buildings will also be built, while existing offices, garages and training facilities are refurbished.

The upgraded barracks will accommodate units moving from sites in Nottinghamshire and Telford. New buildings will incorporate heat pumps, solar panels, rainwater collection and energy-efficient ventilation.

Construction officially began on 29 October 2026, with the Defence Infrastructure Organisation confirming the milestone on 4 November.

New 247-place prison block completed at HMP Elmley in Kent

Construction has been completed on a new prison houseblock providing 247 additional places at HMP Elmley on the Isle of Sheppey in Kent.

Read story

Construction has been completed on a new prison houseblock providing 247 additional places at HMP Elmley on the Isle of Sheppey in Kent.

The new four-storey building expands accommodation at the existing Category B/C prison and includes reinforced windows designed to make it harder for drones to deliver contraband.

A new workshop has also been built to provide vocational training and other employment-related skills to prisoners. The Ministry of Justice confirmed the completion on 9 October, with the first occupants expected to arrive in the following weeks.

The expansion forms part of a wider government programme to add 14,000 prison places by 2031. The new facilities at Elmley have been physically completed, although the start of regular operation and occupancy of the additional accommodation has not yet been confirmed.

London Fire Brigade secures approval for its return to Lambeth

London Fire Brigade confirms planning permission to refurbish its historic headquarters at 8 Albert Embankment. The plans modernise the operational Lambeth Fire Station, improve training facilities and appliance bays, and bring vacant offices back into use as headquarters for the service’s professional teams. They also provide community space and a home for the Brigade’s historic collection.

Read story

London Fire Brigade confirms planning permission to refurbish its historic headquarters at 8 Albert Embankment. The plans modernise the operational Lambeth Fire Station, improve training facilities and appliance bays, and bring vacant offices back into use as headquarters for the service’s professional teams. They also provide community space and a home for the Brigade’s historic collection.

£42m Tonbridge and Hildenborough flood scheme opens

The expanded Leigh storage area and new Hildenborough defences now protect 1,870 homes and 575 businesses. Storage capacity has risen 23% to about 7.4 million cubic metres.

Read story

The expanded Leigh storage area and new Hildenborough defences now protect 1,870 homes and 575 businesses. Storage capacity has risen 23% to about 7.4 million cubic metres.