UK Progress Atlas

Urban Development & Housing · Residential

West Park Student Residences — University of Exeter

West Park is a major redevelopment of student housing at the University of Exeter[1][2][3][4]

Current position

Two buildings topped out by early November 2026. University project timetable plans 618 bedrooms for September 2027, including Birks Grange Central Block, refurbished Blocks A–E and West Park Block GH; a further 1,231 are scheduled for September 2028. The scheme remains under construction and is not occupied.

Why it matters

  • The project expands and renews on-campus accommodation while introducing high-efficiency buildings designed to use less heating energy and provide more comfortable rooms. The scheme combines bedrooms with study, social and commercial amenities, and may reduce pressure on private student housing in Exeter.

Technology

New blocks are designed for Passivhaus certification; air-source heat pumps and roof solar, gas-free new buildings. Certification and actual operational savings not yet achieved.

Scope

Six new accommodation blocks plus refurbishment and renewal at Birks Grange; £185m contractor package reported in 2025, not verified total capital expenditure.

Map information

Approximate representative point in the former Clydesdale redevelopment area, on the west side of Streatham Campus. The scheme also includes Birks Grange Village; the pin is not a surveyed block footprint. [5][6]

Timeline

Summer 2025 — Construction begins
Construction starts on the West Park and Birks Grange redevelopment.

3 November 2026 — First two buildings topped out, reported
The first two buildings reach topping-out; the physical ceremony date is not independently established.

Latest developments

Urban Development & Housing · 3 November 2026

First two buildings topped out at Exeter's 1,849-bed low-energy student housing development

The first two buildings have topped out at the University of Exeter's West Park development, a major expansion and refurbishment of student accommodation on the Streatham Campus. The scheme will provide 1,849 new and refurbished bedrooms, with its first students expected to move in during September 2027.

Designed by Willmore Iles Architects and Architype and built by Bouygues UK for UPP and the university, the new buildings are being constructed to Passivhaus energy-efficiency standards. They will operate without gas, using heat pumps and rooftop solar panels, alongside communal study and social facilities.

Construction began in summer 2025. The first phase is planned to provide 618 bedrooms in September 2027, with a further 1,231 due in September 2028. The two topped-out buildings mark visible progress towards delivering one of Europe's largest Passivhaus student accommodation schemes.

Sources
  1. exeter.ac.uk ↗
  2. theconstructionindex.co.uk ↗
  3. buildnews.co.uk ↗
  4. willmoreiles.com ↗
  5. exeter.ac.uk ↗
  6. getthedata.com ↗