Facilities and patient access
The centre connects with the main clinical building, replaces the hospital’s older Surgical Short Stay Unit and has a dedicated arrival and drop-off area. Patients reach the centre from Egerton Road at the rear of the hospital.[4]
Operating theatres and recovery spaces serve planned cancer operations and other elective surgery. Patients requiring short-stay recovery can spend up to 48 hours on Shalford Ward.
Opening in two phases
Three theatres opened on 16 November for ear, nose and throat, breast, and oral and maxillofacial surgery. The first patient underwent breast surgery. The post-anaesthetic care unit and Shalford Ward also opened in this phase.[5]
The remaining three theatres are due to open in early 2027. Once all six are in use, the Trust expects capacity for around 7,000 additional operations a year.
Modular construction and equipment
Construction began in February 2024. More than 160 steel-framed modules were manufactured in Hull and assembled alongside the existing hospital. The Trust reported delivery of 169 modules during the build.[6][7][8]
Charitable donations have funded more than £3.5 million of advanced surgical equipment for the centre, including equipment for minimally invasive surgery. The Trust gives £41.5 million as the centre’s development cost.[9]
Map information
The marker follows the hospital Trust’s published CASIC entrance pin. The Trust also provides the what3words reference traded.nearly.figure. [3]
Timeline
February 2024
Construction begins beside the hospital.
May 2025
The prefabricated modules are installed on site.
16 November 2026
First patients receive surgery as three theatres and associated facilities open.
Early 2027
The remaining three theatres are scheduled to open.
Latest developments
A new £41.5 million Cancer and Surgical Innovation Centre has opened at Royal Surrey County Hospital in Guildford, with the first patients receiving operations on 16 November. The development adds six operating theatres, specialist recovery facilities and a 24-bed short-stay ward, with capacity to perform around 7,000 additional operations a year when fully operational.
Three theatres have opened in the first phase, initially providing ear, nose and throat, breast and maxillofacial surgery. The remaining three are due to open in early 2027, when further specialties will move into the building. The centre includes a post-anaesthetic care unit and Shalford Ward, where patients can recover after shorter surgical procedures.
The building was assembled from more than 160 prefabricated modules manufactured in Hull and installed at the hospital over a two-year construction programme. Royal Surrey says charitable donations have also funded more than £3.5 million of advanced surgical equipment for the new facility.