2026
Today · 24 NovKendrew Barracks Military Working Dog FacilitiesOpened29 September 2026
Critical Infrastructure
New veterinary, rehabilitation, training and kennel facilities at Kendrew Barracks provide the home of the 1st Military Working Dog Regiment. The opened dog compound forms part of a wider £77 million investment programme at the barracks.
Official opening of the veterinary clinic and kennels; further scent-training and headquarters works have separate delivery dates.
Project details · MapLeigh and Hildenborough Flood DefencesOpened30 September 2026
Critical Infrastructure
The Environment Agency has opened the expanded Leigh flood storage area and new Hildenborough defences after a three-year construction programme.
Official opening of the expanded Leigh storage area and Hildenborough defences.
Project details · MapChaul End Reservoir ExtensionCompletion confirmedBy summer 2026
Critical Infrastructure
A new treated-water reservoir at Chaul End, near Luton, adds approximately 20 million litres of storage alongside the existing reservoir. The £10m extension is in service.
Confirmed in service during summer; no exact commissioning day is reported.
Project details · MapHMP Elmley — New 247-Place HouseblockCompletion confirmedBy 9 October 2026
Critical Infrastructure
A new prison accommodation block has been completed at HMP Elmley, the existing Category B/C adult men's prison on the Isle of Sheppey in Kent. The building provides 247 additional places and is part of a wider effort to increase capacity in England and Wales's prison system.
Physical construction completion confirmed by this date; first prisoner occupancy remains unconfirmed.
Project details · Map2027
2028
2029
Havant Thicket ReservoirPipeline completion2029
Critical Infrastructure
Portsmouth Water is building an 8.7-billion-litre reservoir north of Havant, with two pipelines to fill it from local springs and supply water when needed.
Portsmouth Water’s May 2026 forecast for the pipelines; reservoir operation is separately forecast for 2032.
Project milestones
HMP Welland OaksCompletion / operation2029
2030
2031
HMP Garth 2Completion / operation2031
Critical Infrastructure
HMP Garth 2 is a planned category C prison beside the existing Garth and Wymott prisons near Leyland.
Project details · Map2032
Havant Thicket ReservoirCompletion / operation2032
Critical Infrastructure
Portsmouth Water is building an 8.7-billion-litre reservoir north of Havant, with two pipelines to fill it from local springs and supply water when needed.
Forecast start of reservoir operation.