2025
Auchteraw BESSCommercial operationSummer 2025
Renewables & Energy
Auchteraw is Field’s grid-scale battery near Fort Augustus in the Scottish Highlands.
Commercial operation began in summer 2025, as confirmed by Field’s March 2026 announcement.
Project details · MapCleve Hill 373 MW Solar FarmCompleted1 July 2025
Renewables & Energy
Cleve Hill is a large solar farm near Faversham on the north Kent coast, with a separately mapped energy-storage component.
Solar construction completion and full commercial operation; the separate battery phase is excluded.
Project details · MapThurrock Storage 300 MW BESSOpenedAugust 2025
Renewables & Energy
Thurrock Storage is Statera’s large battery installation in Essex, providing flexible electricity storage for the grid.
Project details · Map2026
Today · 25 OctZenobe Kilmarnock South 300 MW BESSOpened21 January 2026
Renewables & Energy
Kilmarnock South is a grid-connected battery designed to store electricity and support a stable network as renewable generation grows.
Project details · MapSSE Ferrybridge 150 MW BESSCompleted20 March 2026
Renewables & Energy
SSE’s Ferrybridge battery reuses the site of a former coal-fired power station in West Yorkshire to store and release electricity.
Project details · MapCoalburn I 500 MW BESSOpenedAugust 2026
Renewables & Energy
Coalburn 1 is a large battery-storage installation in South Lanarkshire, developed by CIP with Alcemi.
Project details · MapWhitebirk BESSCommercial operation confirmedBy 13 March 2026
Renewables & Energy
Whitebirk is Field’s grid-scale battery near Blackburn in Lancashire.
Field confirmed operation on 13 March 2026 following energisation earlier that month.
Project details · MapHighview Carrington Liquid Air Energy StorageFirst phaseH2 2026
Renewables & Energy
Highview’s Carrington plant will store energy by liquefying air, then expanding it to generate electricity when required. The facility is under construction at Trafford Low Carbon Energy Park.
Forecast made in November 2025; not confirmation of full-facility operation.
Project details · MapHams Hall 350 MW BESS350 MW phase commercial operationQ4 2026
Renewables & Energy
BW ESS and AIP Management are building Hams Hall battery energy storage facility near Kingsbury in North Warwickshire. The first phase will provide 350 MW of power and 1,243 MWh of storage. A further 50 MW phase is planned, taking the full development to 400 MW and 1,424 MWh.
First-phase commercial-operation forecast. A commissioning date for the later 50 MW phase has not been established.
Project details · MapDogger Bank Wind Farm ASubstantially complete commissioningEnd of 2026OFF
TRACK
Renewables & Energy
Dogger Bank A is the first phase of the North Sea wind development, with 95 Haliade-X turbines rated at 13 MW each. The developer describes the phase as approximately 1.2 GW. Electricity reaches the mainland through offshore and onshore converter stations and a high-voltage direct-current transmission system.
The October government consultation reports ongoing turbine remediation, technical defects and resource constraints delaying commissioning beyond earlier forecasts.
SSE’s May 2026 forecast for substantially complete commissioning. October government consultation records continuing technical and commissioning delays.
Project details · MapEast Anglia THREE Offshore Wind FarmFull operationEnd of 2026
Renewables & Energy
East Anglia THREE is ScottishPower Renewables and Masdar’s 1.4 GW offshore wind project, about 69 km off Suffolk. Power will reach the National Grid through subsea export cables, a landfall at Bawdsey and an underground cable route to a converter station at Bramford.
ScottishPower’s 17 August 2026 full-operation target; foundation installation and commissioning are earlier construction milestones.
Project details · MapSofia Wind Farm 1400 MWCompletion / operationLate 2026
Renewables & Energy
RWE’s Sofia offshore wind farm is being built on Dogger Bank, with power exported to Teesside through an offshore converter and subsea cable.
Project details · MapDalmarnock Battery Energy StorageCompletion / operation2026-12
Renewables & Energy
Dalmarnock is Econergy’s 40MW, 120MWh battery storage project in Glasgow. It has been connected to the grid and is being brought into commercial operation.
Forecast full commercial operation; grid connection has already occurred.
Project details · MapCleve Hill 150 MW BESSCompletion / operation2026
Renewables & Energy
The storage component of Cleve Hill Solar Park is intended to complement the adjacent solar generation near Faversham.
Quinbrook estimates commercial operation of the 150MW / 300MWh battery in 2026. The solar farm began operating in July 2025.
Project details · MapIceni Battery Energy StorageCompletion / operation2026
Renewables & Energy
Iceni is Ørsted’s 300MW, 600MWh battery storage project beside the Hornsea 3 onshore converter station at Swardeston, near Norwich. The two battery areas use a shared grid connection with the wind-farm infrastructure.
The March 2025 operational forecast; the October update confirms commissioning, without replacing that forecast.
Project details · MapSanquhar II 308 MW WindfarmCompletion / operation2026
Renewables & Energy
Sanquhar II is an onshore wind farm in southern Scotland, with an associated energy-storage facility.
Project details · Map2027
Thorpe Marsh 1450 MW BESSCompletion / operationQ1 2027
Renewables & Energy
Thorpe Marsh is a major battery project beside a former coal-power site and National Grid substation in Yorkshire.
Project details · MapBlackhillock 300MW BESSCompletion / operationH1 2027
Renewables & Energy
Zenobē’s Blackhillock battery near Keith stores electricity and provides grid-stability services to help absorb Scottish renewable generation.
Final commissioning of the full 300MW / 700MWh build is scheduled for Q1–Q2 2027. The initial 200MW phase entered operation in early 2025.
Project details · MapStaythorpe 360 MW BESSCompletion / operationMid 2027
Renewables & Energy
Elements Green is building a 360 MW / 720 MWh battery and 400 kV grid substation at Staythorpe in Nottinghamshire, with Mitie Power & Grid delivering construction.
The 360MW / 720MWh battery and associated grid infrastructure are scheduled to be fully operational by mid-2027.
Project details · MapMatrix 500 MW Eccles BESSCompletion / operationQ3 2027
Renewables & Energy
Matrix Renewables’ Eccles battery is a separate Scottish Borders project from Zenobē’s nearby development.
Forecast commercial operation of the Eccles battery.
Project details · MapCarrington 680 MW BESSGrid energisationLate 2027
Renewables & Energy
Carrington Storage is Statera’s 680MW, 1,360MWh battery project under construction at Trafford Low Carbon Energy Park. It is separate from Highview’s liquid-air plant and the proposed hydrogen facility.
Energisation target, distinct from full commercial operation.
Project details · MapHornsea Project ThreeCompletion / operationEnd of 2027
Renewables & Energy
Hornsea Project Three is Ørsted’s 2.9 GW offshore wind project in the Hornsea zone, approximately 120 kilometres off Norfolk.
Project details · MapTwyn Hywel Energy ParkFirst electricityLate 2027
Renewables & Energy
Construction began at Twyn Hywel Energy Park in June 2026. The development will have up to 93.8 MW of generating capacity, with turbines reaching a maximum height of 200 metres. Bute Energy secured £160 million of project debt financing from Lloyds and Rabobank after obtaining planning consent. It is the first wind farm in the developer’s Welsh portfolio to reach construction.
Developer forecast.
Project milestones
AW 1 Uskmouth 120 MW BESSCompletion / operation2027
Renewables & Energy
AW1 is Ampeak’s battery project at the former Uskmouth power-station site.
Project details · MapCoalburn 2 500MW BESSCompletion / operation2027
Renewables & Energy
Coalburn 2 is a separate battery phase beside Coalburn 1 in South Lanarkshire.
Investor AIP and developer CIP target commissioning of Coalburn 2 in 2027.
Project details · MapInch Cape Offshore Wind FarmCompletion / operation2027
Renewables & Energy
Inch Cape is a 1,142 MW offshore wind farm under construction off the Angus coast, with its grid connection in East Lothian.
Project details · MapOaklands Farm Solar ParkCompletion / operationEnd of 2027 or early 2028
Windyhill battery storageCommercial operationQ4 2027 or Q1 2028
Renewables & Energy
Revera is building a battery energy storage system at Bearsden, north-west of Glasgow, close to the B6 transmission boundary.
Revera’s 23 September 2026 announcement gives Q4 2027. Its UK project page and 6 August announcement give Q1 2028; these forecasts remain inconsistent.
Project details · MapZenobe Eccles 400 MW BESSCompletion / operation2027
Renewables & Energy
Zenobē’s Eccles battery in the Scottish Borders is designed to reduce wasted wind energy and support the electricity network.
Project details · Map2028
Noriker Kilmarnock South battery storageCompletion / operationEarly 2028
Renewables & Energy
Construction is under way on the 350-megawatt Kilmarnock South battery at Camsiscan Farm in South Ayrshire. Developed by Noriker and backed by Copenhagen Infrastructure Partners, the facility is designed to store electricity for several hours before supplying it back to the grid. Commercial operation is targeted for early 2028.
Owner’s construction target, retaining the stated early-year precision.
Project details · MapPulse Penn BESSCompletion / operationEarly 2028
Renewables & Energy
Pulse Penn is a 129 MW / 362 MWh battery energy storage project near Wolverhampton. NESO’s register locates Pulse’s Penn battery components at Awbridge Farm, west of Blackpit Lane in Lower Penn. The map marks the approximate main site.
Statkraft’s operation forecast. METLEN’s end-2027 energisation target is a separate grid milestone, not full commercial operation.
Project details · MapTwyn Hywel Energy ParkFull operationEarly 2028
Renewables & Energy
Construction began at Twyn Hywel Energy Park in June 2026. The development will have up to 93.8 MW of generating capacity, with turbines reaching a maximum height of 200 metres. Bute Energy secured £160 million of project debt financing from Lloyds and Rabobank after obtaining planning consent. It is the first wind farm in the developer’s Welsh portfolio to reach construction.
Developer forecast for full operation. First power is targeted for late 2027; final testing and restoration may continue into winter 2028.
Project milestones
Matrix Kilmarnock Energy CentreCompletion / operationQ3 2028
Renewables & Energy
Matrix Renewables is developing a 500-megawatt battery storage facility beside the Kilmarnock electricity substation in East Ayrshire. The project received consent in April 2025 and is progressing through surveys and preparation for construction. It would store electricity and return it to the network when needed.
Matrix’s indicative programme targets completion in the third quarter of 2028. Preparatory surveys are reported; the listed fourth-quarter 2026 construction start is a forecast.
Project details · MapRevera Hunterston BESS 400 MW / 800 MWhCompletion / operationQ3 2028
Renewables & Energy
Revera’s Hunterston Battery Energy Storage System is a 400 MW / 800 MWh project in North Ayrshire, Scotland, connecting to SP Energy Networks’ 400 kV transmission system.
Revera expects commercial operations in Q3 2028.
Project details · MapPembroke 350 MW BESSCompletion / operationH2 2028
Renewables & Energy
RWE plans a battery facility beside Pembroke Power Station as part of its wider low-carbon energy programme.
RWE expects commissioning and operation in the second half of 2028, subject to an updated, timely grid connection.
Project details · MapTwyn Hywel Energy ParkFinal worksWinter 2028
Renewables & Energy
Construction began at Twyn Hywel Energy Park in June 2026. The development will have up to 93.8 MW of generating capacity, with turbines reaching a maximum height of 200 metres. Bute Energy secured £160 million of project debt financing from Lloyds and Rabobank after obtaining planning consent. It is the first wind farm in the developer’s Welsh portfolio to reach construction.
Forecast for remaining energisation, testing and restoration.
Project milestones
Devilla 500 MW BESSCommissioning2028
Renewables & Energy
Devilla is a 500 MW, two-hour lithium-ion battery storage project at Kincardine, developed by Copenhagen Infrastructure Partners with Alcemi. The transmission-connected facility is intended to support grid stability and integration of renewable electricity.
CIP’s June 2026 commissioning forecast.
Project details · MapEast Anglia TWO Offshore Wind FarmCompletion / operation2028
Renewables & Energy
East Anglia TWO is ScottishPower Renewables’ 960MW offshore wind farm under construction in the southern North Sea, around 33km from Suffolk at its nearest point. Its export connection comes ashore north of Thorpeness.
Developer target for commercial operation.
Project details · MapHarker Battery Storage (formerly Blackdyke Farm)Completion / operation2028–2029
Renewables & Energy
Zenobē’s planned 400 MW / 800 MWh Harker battery-storage facility was developed by Innova as Blackdyke BESS and acquired in August 2025. The marker uses Zenobē’s published site grid reference, identifying the project site rather than a surveyed battery-unit position.
Developer forecast: commercial operation in late 2028 or early 2029; energisation is a separate earlier milestone.
Project details · MapHartmoor BESSGrid energisation2028
Renewables & Energy
Hartmoor is Field’s 200 MW battery project near Hartlepool in north-east England.
Field’s July 2026 forecast is for grid energisation in 2028.
Project details · MapOaklands Farm Solar ParkCompletion / operationEnd of 2027 or early 2028
Orkney Transmission LinkCompletion / operation2028
Renewables & Energy
The Orkney Transmission Link will connect the islands to the mainland GB electricity transmission network for the first time. The map shows an approximate alignment within the licensed Warebeth–Dounreay subsea corridor; onshore sections are not mapped.
Retain the wider link’s 2028 target; substation buildings are component phases, not separate projects.
Project details · MapWindyhill battery storageCommercial operationQ4 2027 or Q1 2028
Renewables & Energy
Revera is building a battery energy storage system at Bearsden, north-west of Glasgow, close to the B6 transmission boundary.
Revera’s 23 September 2026 announcement gives Q4 2027. Its UK project page and 6 August announcement give Q1 2028; these forecasts remain inconsistent.
Project details · Map2029
Beacon Fen Energy ParkCompletion / operation2029OFF
TRACK
Renewables & Energy
Beacon Fen Energy Park is a consented solar and battery-storage development east of Sleaford and north of Heckington, linked to Bicker Fen substation.
The legal challenge creates uncertainty over delivery.
Low Carbon’s forecast for operation.
Project details · MapBramford Storage — ClearstoneCompletion / operation2029
Renewables & Energy
Clearstone Energy is developing a 400-megawatt battery storage facility outside Bramford, near Ipswich in Suffolk. The approved project would connect beside National Grid’s Bramford substation, which carries power from East Anglia towards London. Clearstone targets operation in 2029.
Clearstone’s target for the facility to enter operation; the date remains a forecast.
Project details · MapEastern Green Link 2 (EGL2)Completion / operation2029
Renewables & Energy
Eastern Green Link 2 (EGL2) is a 2 GW HVDC connection between Peterhead in Aberdeenshire and Drax in North Yorkshire. It is shown as an approximate point at the Peterhead end; the full cable route is not yet mapped.
Operator target for the full project; it is not a completion date for the mapped section.
Project details · MapEryri Visual Impact ProvisionPylon and overhead-line removal2029
Renewables & Energy
National Grid is moving the electricity connection across the Dwyryd Estuary into a 3.4 km tunnel between Minffordd and Llandecwyn. Once the underground connection is operating, ten pylons and roughly 3 km of overhead line can be removed, opening up views across the estuary and the western edge of Eryri National Park.
National Grid targets removal of the existing pylons and overhead line in 2029, after the underground connection becomes operational. The exact cable energisation date is unconfirmed.
Project details · MapHarker Battery Storage (formerly Blackdyke Farm)Completion / operation2028–2029
Renewables & Energy
Zenobē’s planned 400 MW / 800 MWh Harker battery-storage facility was developed by Innova as Blackdyke BESS and acquired in August 2025. The marker uses Zenobē’s published site grid reference, identifying the project site rather than a surveyed battery-unit position.
Developer forecast: commercial operation in late 2028 or early 2029; energisation is a separate earlier milestone.
Project details · Map2030
Hinkley Point C Nuclear Power StationFirst reactor start-up2030OFF
TRACK

Renewables & Energy
Hinkley Point C is a two-reactor nuclear power station under construction in Somerset.
2029 → 2030. The first reactor’s expected start has moved back by a year.
This is the first reactor’s expected start; the second is reported to follow about a year later.
Project details · MapStatera Sundon 500MW BESSCompletion / operation2030
Renewables & Energy
Sundon Storage is Statera’s consented battery project, intended to store surplus renewable electricity and release it during higher demand.
Target for full operation; long-duration configuration is conditional.
Project details · Map2031
Great Oak Energy HubCompletion / operation2031
Renewables & Energy
Approved 400MW battery storage project at Knepp, east of Shipley Road, under Horsham consent DC/24/1289. Battery equipment occupies around five hectares within a wider landscaped site. The promoter gives a long-dated 2031 delivery target; approval does not mean construction has begun.
Whole-project operation date is not inferred from construction duration, component commissioning or grid energisation.
Project details · Map2032
Junction 27 Energy HubCompletion / operation2032
Renewables & Energy
Approved 400MW battery project near Junction 27 of the M5 at Westleigh, under Mid Devon consent 23/01351/MFUL. Around six hectares of infrastructure sit within a wider landscaped site. The promoter targets operation in 2032; this long-dated target does not imply construction is imminent.
Whole-project operation date is not inferred from construction duration, component commissioning or grid energisation.
Project details · Map2033
2034
2035
Dinorwig Pumped Storage ReplantingCompletion / operation2035
Renewables & Energy
Dinorwig is a 1.8 GW pumped-storage power station in Gwynedd, North Wales. Its replanting programme is modernising ageing generating units to extend the station’s operating life and retain its rapid-response storage capacity.
Full refurbishment of all six units.
Project details · Map2036
2037
2038
2039
2040
STEP FusionCompletion / operation2040
Renewables & Energy
STEP Fusion is the UK programme to design and deliver a prototype spherical-tokamak fusion power plant at the former West Burton A power-station site in Nottinghamshire.
Target for the prototype plant to begin operations.
Project details · Map